ATC Logo Ministry Logo

Ministry of Water & Environment

Appropriate Technology Center

Kaberamaido

District Data Analysis - Sanitation

Sanitation District
19

Total Records

9

Unique Challenges

10

Technologies

3

Active NGOs

About Kaberamaido

No information available

15 Sub-counties 9 Challenges 10 Technologies 3 NGOs
Challenges by Category
Technology Status
NGO Interventions
Top Challenges by Occurrences
Top Challenges
# Challenge Occurrences
1 Rapid population growth 2
2 High pollution rates from automobiles 1
3 Quaring and sand mining 1
4 Non-biodegradable pesticides and plastic materials 1
5 Bush burning 1
6 Lack of enforcement of sanitation laws 1
7 Climate change leading to rise in water levels in ... 1
8 Poor financing 1
9 Poor sanitation infrustructure 1
All Challenges in Kaberamaido
Challenge Category Locations About
Bush burning Sanitation No location specified -
Climate change leading to rise in water levels in lakes causing flooding Sanitation No location specified -
High pollution rates from automobiles Sanitation No location specified -
Lack of enforcement of sanitation laws Sanitation No location specified -
Non-biodegradable pesticides and plastic materials Sanitation No location specified -
Poor financing Sanitation No location specified -
Poor sanitation infrustructure Sanitation No location specified -
Quaring and sand mining Sanitation No location specified -
Rapid population growth Sanitation Kobulubulu Ochero -
Technology Distribution
Technologies by Status
Status Count Percentage
Functioning 0 0%
Not Functioning 0 0%
Unknown 10 100%
All Technologies in Kaberamaido
Technology Category Sub Category Location Capital Cost Status
Improved Sanitation Sanitation - 10-18M Review
VIP Sanitation - 3M Review
Drainable pit latrines Sanitation - 5M @Stance Review
Traditional pit latrine with washable floor and squathole cover Sanitation - 10M-15M Review
Waterborne toilets Sanitation - 15-20M Review
Hygiene Sanitation - 20K-100K Review
drying racks Sanitation - 20K-100K Review
Faecal Sludge Mgt Sanitation - 8M-20M Review
Waste water Sanitation - Review
Storm water mgt Sanitation - 300K Review
NGO Distribution
NGOs Operating
# NGO Name Technology
1 POPOW Aluwa sc, ochero
2 POPOW Drainable pit latrine
3 Prince of Peace for Orphans and Widows (POPOW) DBH drilling and rehabilitation, spout filters
NGO Details
NGO Name Technology Areas of Operation Steps Followed
POPOW Aluwa sc, ochero - -
POPOW Drainable pit latrine Kobulubulu... inception at district, consultative meetinf, Mo O signing, implementation, train...
Prince of Peace for Orphans and Widows (POPOW) DBH drilling and rehabilitation, spout filters Awijobi-Oriamo-Alwa subcounty, Kaberamaido S/C... Inception meeting, MoU signing with district and community, implementation, trai...
Challenges
Challenge Category Locations About
Bush burning Sanitation No location specified -
Climate change leading to rise in water levels in lakes causing flooding Sanitation No location specified -
High pollution rates from automobiles Sanitation No location specified -
Lack of enforcement of sanitation laws Sanitation No location specified -
Non-biodegradable pesticides and plastic materials Sanitation No location specified -
Poor financing Sanitation No location specified -
Poor sanitation infrustructure Sanitation No location specified -
Quaring and sand mining Sanitation No location specified -
Rapid population growth Sanitation Kobulubulu Ochero -
Technologies
Technology Category Sub Category Location Capital Cost Status
Improved Sanitation Sanitation - 10-18M Review
VIP Sanitation - 3M Review
Drainable pit latrines Sanitation - 5M @Stance Review
Traditional pit latrine with washable floor and squathole cover Sanitation - 10M-15M Review
Waterborne toilets Sanitation - 15-20M Review
Hygiene Sanitation - 20K-100K Review
drying racks Sanitation - 20K-100K Review
Faecal Sludge Mgt Sanitation - 8M-20M Review
Waste water Sanitation - Review
Storm water mgt Sanitation - 300K Review
NGOs
NGO Name Technology Areas of Operation Steps Followed
POPOW Aluwa sc, ochero - -
POPOW Drainable pit latrine Kobulubulu... inception at district, consultative meetinf, Mo O signing, implementation, train...
Prince of Peace for Orphans and Widows (POPOW) DBH drilling and rehabilitation, spout filters Awijobi-Oriamo-Alwa subcounty, Kaberamaido S/C... Inception meeting, MoU signing with district and community, implementation, trai...