Discover adaptation technologies and challenges in Namutumba district.
No map available for Namutumba district
| Technology | Category | Sub Category | Location | Capital Cost | Status | Actions |
|---|---|---|---|---|---|---|
|
DBH
Mechanically pumped by hand... |
Water | - | 25-30M depending on depth | Review | ||
|
Protected Spring
water naturally flowing from eyes, protected, stormwater diverted and collected ... |
Water | - | Review | |||
|
Rain water Harvesting
roof catchment, stored in a tanks and water drawn from taps... |
Water | - | 2.5 to 3.5 Million | Review | ||
|
Piped water schemes
production wells motorised using the national grid, powering water to a raised r... |
Water | - | Approx 60 to 80m depending of connections | Review | ||
|
Solar Mini piped system
production wells motorised using solar energy, powering water to a raised reserv... |
Water | - | 350-450 million | Review | ||
|
Open streams
people collecting water from naturally flowing streams in the valleys... |
Water | - | Review | |||
|
Local protection at source
especially for springs, storm water diversion... |
Water | - | Review |
No challenges recorded in Namutumba district yet.
No NGOs registered in Namutumba district yet.