Discover adaptation technologies and challenges in Kotido district.
No map available for Kotido district
| Technology | Category | Sub Category | Location | Capital Cost | Status | Actions |
|---|---|---|---|---|---|---|
|
Domestic Water Supply
wells of depths greater than 30m, handpumps installed to abstract water... |
Water | - | 20-25M | Review | ||
|
SW
wells of depths less than 30m, handpumps installed to abstract water... |
Water | - | 5-10M | Review | ||
|
Motorised PWS
high yeilding well motorised to pumped to elevated reservoir and distributed to ... |
Water | - | 300M+ | Review | ||
|
Domestic Water Treatment/Purification
chorination units installed to treat water in the PWS... |
Water | - | Review | |||
|
Point of Use
water boiled before use... |
Water | - | Review | |||
|
WfP
earth embarked/barrier watt to block water flow and create a reservoir installed... |
Water | - | 5B+ | Review | ||
|
VT
earth excavated to store water, installed with inlet and outlet... |
Water | - | 475M+ dependint on capacity of tank | Review |
| Challenge | Category | Locations | About | Actions |
|---|---|---|---|---|
| less priotisazaton | Sanitation | No location specified | - | |
| Bush burning | Environment | No location specified | - | |
| Environment degradation charcoal burning | Environment | No location specified | - | |
| High construction costs | Sanitation | No location specified | - | |
| Loose soils - | Sanitation | Nakapelemoru | - | |
| Overgrazing | Environment | No location specified | - | |
| Poverty | Sanitation | No location specified | - | |
| Prolonged dry spell | Environment | No location specified | - | |
| Soil erosion | Environment | No location specified | - |
| NGO Name | Technology | Areas of Operation | Steps Followed | Actions |
|---|---|---|---|---|
| save the Children | Traditional pit latrines, | Nabwalin comm. Schools, nakareto P/S, Rengen, Nakapelemoru,... | Signing of MOU, Advocacy, community dialogs... | |
| Whave solutions | DBH Rehab | All the sub-counties... | - | |
| Yes | Limited capacity which leads to over filling and littering of the sorrounding | Yes... | NGO makes MOU with the district, implementation of planned activities... | |
| Yes | air pollution | Yes... | NGO makes MOU with the district, implementation of planned activities... | |
| Yes | pollution of soils and underground water | Yes... | NGO makes MOU with the district, implementation of planned activities... | |
| yes | slow growth of trees which delays positive impacts | Yes... | NGO makes MOU with the district, implementation of planned activities... | |
| yes | Contant natural soil periodic compaction leading to more soil being required to back fill | Yes... | NGO makes MOU with the district, implementation of planned activities... |